Miami-Dade and Broward are the High Velocity Hurricane Zone. What that means for products, approvals and the code edition.
Chapter 2 of the Florida Building Code, Building, 8th Edition (2023), defines the High Velocity Hurricane Zone as consisting of Broward and Miami-Dade counties. The same chapter defines a wind-borne debris region as areas within hurricane-prone regions located within 1 mile (1.61 km) of the mean high-water line where an Exposure D condition exists upwind at the waterline and the ultimate design wind speed, Vult, is 130 mph or greater. A wind-borne debris region also includes areas where the ultimate design wind speed, Vult, is 140 mph (63.6 m/s) or greater. [us-006]
Section 553.842, Florida Statutes, directs the Florida Building Commission to adopt rules for a statewide product evaluation and approval system that operates in coordination with the Florida Building Code. The Commission must use one of the statutory approval methods for panel walls, exterior doors, roofing, skylights, windows, shutters, impact protective systems, and structural components as established by rule. A product may not be advertised, sold, or marketed as hurricane, windstorm, or wind-borne debris impact protection unless it is approved under section 553.842 or s. 553.8425. The statute specifically names the Miami-Dade County Building Code Compliance Office Product Control Division among the approved evaluation entities. [us-007]
The Miami-Dade County Product Control Section receives applications for product approval and reviews and approves or denies building construction materials, products, and systems used to protect the building envelope. The Section mainly addresses windows, exterior glazing, wall cladding, roofing, exterior doors, skylights, glass block, siding, and shutters. A first-time product approval costs $4,000 and is valid for five years, a revision or renewal costs $1,500, and all fees are subject to a 7.5% surcharge. The County reports reviewing an average of 1,250 product approval applications and conducting more than 850 quality assurance audits each year. Approvals can be looked up in the County's online Product Approval Search. [us-008]
The Florida Building Commission website states that the effective date for the Florida Building Code, 8th Edition (2023), is December 31, 2023. The same page links to materials related to the 2026 Update of the code, including tracking charts. The Commission's Building Code Information System at floridabuilding.org also hosts the Florida Product Approval system, binding interpretations, and proposed code modifications. [us-001]
A Miami-Dade County Permitting and Inspection Center notice states that the Florida Building Code Ninth (2026) Edition becomes effective on December 31, 2026. All permit applications and plans submitted on or after that date must comply with the new edition. Any application submitted through the County's online portal after the close of business at 4 PM on December 30, 2026, must comply with the 2026 edition. For expired permit applications filed before December 30, 2026, the County will grant extensions for permit issuance only if the request is made in writing, shows the application was pursued in good faith, and is made no later than 180 days after expiration. [us-002]
Applied to your projectPermit Readiness Report, USD 199 →
General information about Florida rules, compiled from official sources. Not legal advice and not an inspection or engineering opinion; for your own case ask a Florida licensed attorney, engineer or the building department.