Six documents, one question: what will this unit cost?
Milestone inspection report
Required for condo buildings of three stories or more once they reach 30 years, then every 10 years. Phase two findings mean repairs are coming.
Structural integrity reserve study (SIRS)
Lists roof, structure, waterproofing, plumbing, electrical and windows, with the money the association should set aside. Compare the recommendation with the reserves on hand.
Budget and financial statement
Shows reserves, insurance cost and how fast the monthly fee is rising.
Board minutes of the last 12 months
Where repairs, loans and special assessments are discussed long before they are approved.
Special assessments and loans
Ask whether buyer or seller pays each installment, and whether a bank loan is being negotiated.
Insurance
Premiums and deductibles for wind and flood drive fees. Ask for the current policy and the renewal quote.
Signs that more costs are coming
- The study shows the structural reserve far below what it recommends.
- Phase two of the milestone inspection found concrete or steel damage that is not yet funded.
- Minutes mention a loan, a contractor selection or an "upcoming assessment".
- The monthly fee rose more than 10 % a year.
- Documents are missing, or the SIRS was not completed.
Check it in time, from the buyer's side.
Free AI document scan
Upload one PDF and see the key figures, warning signs and questions in about a minute.
Scan a documentFree Condo Cost Outlook
Enter the figures and see fees, assessments and your share of unfunded repairs over the next years.
Open the outlookCondo Check, $695
We read all documents and send a written cost outlook with the questions to ask, before your 7 days end.
Order a Condo CheckThe first three Condo Check clients pay $395 instead of $695, in exchange for a short review with their name that we may publish.
Ask for a pilot slot →Frequently asked
How long can I cancel after receiving the condo documents in Florida?
For resale contracts signed since July 1, 2025, 7 days after receipt of the documents, excluding Saturdays, Sundays and legal holidays (F.S. 718.503 as amended by HB 913). Check the date in your contract with your attorney or agent.
What is a SIRS?
The structural integrity reserve study estimates the cost to maintain and replace key structural components and the reserves the association must fund. It applies to condo buildings of three stories or more.
Does a milestone inspection mean the building is unsafe?
No. Phase one is a visual inspection. If it finds substantial deterioration, phase two follows with a repair plan. The cost of those repairs is what buyers need to know.
Who pays a special assessment approved before closing?
That depends on the contract. Many contracts assign installments due after closing to the buyer. Negotiate it in writing before the 7 days end.
Is Alpha Quadrat an engineer or a lawyer?
No. We review documents and estimate costs from the buyer's side. We do not inspect buildings, give legal advice or appraise property. For those, use a licensed engineer, attorney or appraiser.
Sources
- Florida Statutes 718.503 (resale disclosure, cancellation period)
- Florida Statutes 718.112 (structural integrity reserve study)
- Florida Statutes 553.899 (milestone inspections)
- HB 913 (2025), effective July 1, 2025
As of October 2026. This guide is general information, not legal advice.
